TABLE OF CONTENTS
60kW:
Pre-modification checks:
- Confirm the cabinet kit version to determine the specifications of the cable management system components and top cover.
- Confirm the cable specifications (outer diameter of the cable) to determine the cable clamp specifications.
Solution:
- Cable management assembly: No additional clearance space (Figure 2), installed on the top cover, utilizing two lifting rings for assembly, and adding four mounting positions.
- Top cover: Needs to be replaced with added mounting holes and avoidance (Figure 3).
- Support structure: Add four pieces (Figure 4).
- Cable clamp: Select based on the cable specifications.
120/180 kW
Pre-modification checks:
- Confirm the cabinet kit version to determine the cable management system specifications.
- Confirm the cable specifications (outer diameter of the cable) to determine the cable clamp specifications.
Solution:
- Cable management assembly: No additional clearance space (Figure 2), installed on the top cover, utilizing four lifting rings for assembly.
- Cable clamp: Select based on the cable specifications.
Was this article helpful?
That’s Great!
Thank you for your feedback
Sorry! We couldn't be helpful
Thank you for your feedback
Feedback sent
We appreciate your effort and will try to fix the article